Eagle Product Bulletins

Bulletin# Subject Date
376 Fuel Flop Tube Hose Assembly 5-26-2008
375 Optional Concorde RG-25 Battery Installation 3-15-1996
374 New Extruded Fiber Washer will replace the Original Insulator on Mike Jacks 10-20-1995
371 Control Stick Hand Grips 10-1993
370 Fuel Quantity Site Tube & Flop Tube Assembly 10-1993
369 Baffle Reinforcements Added to Eagle II Aircraft 918 Engine Equipment Kit 12-5-1984
368 Addition of Rubber Friction Rings to Vent Valves on the Eagle II 12-4-1984
366 Centerline marks on Spar Splice Fixture use in Construction 12-4-1984
364 Modification of Landing Gear Strut Mounting 11-20-1984
362 Aileron Braces Omitted from Eagle II Aircraft 901 Ailerons Kit 7-23-1984
360 Oil Leakage from 915 Canopy Snubbers 3-5-1984
358 Exhaust Snubber Kit 2-8-1984
357 Lycoming Service Bulletins 465 and 465A Concerning Crankshaft Propeller Flanges 2-8-1984
356 New Type Braces for Ailerons 2-2-1984
342 Installation of Inspection Rings in Fabric of Upper and Lower Wings 12-30-1983
341 Access Doors Available 12-28-1983
333 AVCO/Lycoming Service Bulletin 465 concerning Crankshaft Propeller Flanges 11-3-1983
332 Cockpit Heater System Available 10-21-1983
331 Propeller Flange Failures on Lycoming Engines 9-19-1983
329 Leaking Fuel Tank 8-25-1983
324 Procedure Added to Fuel Tank Filler Mod Described in Earlier Product Letter 306 6-25-1983
322 Change of Finish on Socket Head Cap Screws 6-9-1983
321 Installation of Anti-Chafe and Anti-Vibration Tape on Propellar Hub 6-4-1983
319 Tensioning of Drag and Anti-Drag Tierods in Upper and Lower Wings 6-4-1983
318 Installation of Wind Leading Edges 6-4-1983
317 Inspection of Landing Gear Support Structure on Fuselage 6-3-1983
315 Tire Filler Access 5-24-1983
313 New High-Performance Battery 5-16-1983
312 Carbon Monoxide Detection 5-17-1983
311 Horizontal Stabilizer Incidence 5-12-1983
309 Installation of Fairings and Gap Seals 5-12-1983
307 New Digital Chronometer System 5-10-1983
306 Relocation of Fuel Filler Port 5-10-1983
305 Addition of Hydrolic Snupper to 915 Canopy Kit 5-4-1983
304 Continuing Delay in Delivery of 911-FD Fuel Display Kit 5-2-1983
302 Revision of Fuselage and Canopy Aft Hinge Modification Procedure in Product Letter 295 4-5-1983
297 Change of Fuel Sight Guage Material in 909 Fuel System Construction Kit 3-22-1983
296 Delivery of 911-FD Fuel Display Kit 3-21-1983
295 Change of Canopy Aft Hinge Attachment in 904 and 915 Construction Kits 3-14-1983
294 Addition of Canopy Frame Stiffener and New Oil Cooler Mounting Parts to 620 Cowling Kit 3-11-1983
292 Bendix Magneto Service Bulleting 623 – May Apply to Lycoming Engines 2-21-1983
291 Addition of Canopy Roller Assembly to 915 Canopy Kit 2-21-1983
276 New Digital Fuel Quantity and Fuel Flow Display System 9-16-1982
272 Retention of Edo-Aire Radios 9-16-1982
271 Stainless Steel Hardware Addition to 918 Kit for Exhaust Manifold Slip-Joints 9-15-1982
270 Luggage and Tiedown Storage Kit 9-15-1982
269 New Style Flying Wire Javelins 7-27-1982
268 Cracks in Exhaust Manifold Assemblies 7-26-1982
264 New Battery Clamp Adapter to prevent Possible Electrical Short 7-14-1982
263 Landing Gear Fairings Redesigned to Simplify Installation 7-14-1982
262 New Type Anti-Chaffing Material for Canopy Skirt 7-14-1982
260 Incorrect Park Number Marking of Control Sticks 5-4-1982
257 Proper Installation of Engine-Attach Bolts and Possible Requirement for Bolt Inspection 3-5-1982
256 Incorrect Clevis Bolts Supplied with Previous Product Letter 251 3-2-1982
255 Clarification of Wood Grain Description in Previous Product Letter 252 2-27-1982
252 Inspection of Wing Tierod Blocks 2-16-1982
251 New Hardware for Attachment of Rudder Cable Clevises to Rudder Horns 2-15-1982
250 Ignition Switch 1-8-1982
249 Change of Interplane Strut Mounting Hardware 12-14-1981
248 Inspection of Hinge Pin 12-14-1981
246 FAA Form 8610-2 and 8130-6 added to 924 Flight Kit 10-26-1981
245 Baffle Box added to 918 Engine Equipment Kit 10-26-1981
244 Canopy Brace Inspection 10-08-1981
243 Rear Hinge Assembly Inspection 12-14-1981
242 Incorrect Nutplate Packaged in 915-H4 Hardware Kit 9-22-1981
241 Interim Weight and Balance Data and Flight Manual Data 9-9-1981
239 New Part, ELT Locking Clip 8-4-1981
235 Interim Weight and Balance Data and Flight Manual Data 6-19-1981
234 Tapered Washers for Mounting Interplane Struts 6-15-1981
233 Redesigned Alternate Air Door 6-15-1981
232 Design Modifications by Homebuilders 6-15-1981
228 Rudder Cables Omitted from 908 Cockpit Equipment Kit 5-27-1981
224 Locking Lug for Edo-Aire Radios in 912 NAVCOM Kits 5-26-1981
223 Interim Weight and Balance Data and Flight Manual Data 5-11-1981
218 Fitting of Wing Tip Bows in 902 and 903 Wing Kits 4-23-1981
217 Possibility of Incorrect Parts in 915 Canopy Kit 4-22-1981
215 Interim Flight Manual Data 4-14-1981
214 Interim Weight and Balance Data 4-10-1981
213 Oil Cooler Port Fittings for Lycoming Engines 4-6-1981
212 Interim Weight and Balance Data 3-19-1981
211 Product Manuals 3-7-1981
207 Interim Weight and Balance Data 2-20-1981
205 Mechanical Fastening of Edo-Aire Radio Sets 2-16-1981
204 List of Constrution Tool Requirements 2-8-1981
202 Typographical Errors in Interim Weight and Balance Data 2-3-1981
201 Revised Inspection Plate for Aileron Pushrod Cover 2-13-1981
199 Trimtab Horn on Early Fiberglass and Aluminium Trimtab Assemblies 2-13-1981
198 Inspection Plates supplied in 923 Kit 1-27-1981
197 Canopy Guide Bushings moved from 915 Canopy Kit to 907 Fuselage Equipment Kit 1-28-1981
196 Incorrect Bolt in 907 Kit 1-27-1981
195 Incorrect Bolt in 905 Kit 1-27-1981
194 New Canopy Jettison Tab in 915 Canopy Kit 1-12-1981
192 Existing Placards Revised and New Placards added to 923 Covering and Pre-Finish Kit 12-17-1980
189 Corrected List of Effective Pages in 903 Manual Revision 13 11-14-1980
187 Increased Length of Bushing Welded to Vertical Fin for Attachment of Tail Wire Brackets 11-11-1980
186 Tab Dividers for 912 NAVCOM Product Manual 11-11-1980
185 Illustration Missing from page J-26A of the 903 Manual Revision 13 Pages 11-4-1980
184 Changed Hardware for Attachment of Governor Control Cable to Governor Control Arm 11-4-1980
183 Lycoming Service Bulletin 245C 10-28-1980
181 Increased Length of Bushing Welded to Vertical Fin for Attachment of Tail Wire Brackets 10-16-1980
179 Possibility of Defective Threads in 50130-009 and 50130-010 Tierod Terminals 10-16-1980
177 New Parts added to the 923-L Covering and Prefinish Kit 10-16-1980
176 New Parts and Materials added to the 923 Covering and Prefinish Kit 10-16-1980
174 Extra Inspection Rings for Optional Inspection Holes 7-23-1980
173 Extra Inspection Rings for Optional Inspection Holes 7-11-1980
172 Revised Hardware for attaching Pushrods in Manual Steps A-5 and B-8 7-11-1980
171 Transfer Marking Stud 7-11-1980
169 Electrical Panel Placard Incorrectly Identifies Left and Right Magneto Position 7-9-1980
167 Addition of Ventilation Air Outlets 6-13-1980
166 Relocation of Conopy Lock Panels and Hardware from915 Canopy Kit to 908 Cockpit Equipment Kit 6-13-1980
165 Manual Error in Step A-25. Revised Procedure for Attachment of Airscoops and Vent Covers 6-3-1980
164 Partial Assembly of 915 Canopy Kit in Preparation for Field Installation of Kit by Christen Personnel 5-14-1980
163 Repolitioning of Nutplate Tabs at Station 31 of 904 Fuselage Structure 5-27-1980
162 Product Manual Parts List for 923 Covering and Prefinish Kit 5-3-1980
161 Inspection of Paint Coating on Early 904 Fuselage Structures for Presence of Rust 4-29-1980
160 Inspection of 904 Fuselage Structure for Presence of Tubular Elements 4-29-1980
159 Packaging Error in 923 Series Covering and Prefinish Kits 4-28-1980
158 Replacement of Filament Tape in 923 Covering and Prefinish Kits 4-27-1980
157 Delivery of 915 Canopy Kits and Field Installations by Christen Personnel 4-27-1980
156 Changes in 912 NAVCOM Kit 4-13-1980
155 Revised Product Brochures and New Price List 4-12-1980
151 Shipment of Air Vent Components which have Delayed on Backorder for 914 Kits 3-25-1980
150 Repositioning of Air Vents for best Appearance in both No. 1 and No.2 Paint Designs 3-21-1980
149 Correction of Stabilizer Incidence Angle in Manual 3-13-1980
148 Inspection of Welded Pushrod Assemblies 3-13-1980
147 Part Number Correction in Manual Step D-8 3-3-1980
146 Modify Spring to Eliminate Interferrence with Airbox 2-27-1980
145 Splice Plate added to Recontour Aft Portion of Turtledeck Cover 2-27-1980
144 Hinge Spacer and Washer Spacers Added 2-15-1980
143 Incorrect Parts in 920 Cowling Kit and Requirement for Replacement 1-25-1980
142 Hinge Spacer and Washer Spacera Added 2-13-1980
140 Added Large Area Washer and Changed Bold Length 2-8-1980
137 Modificatin of Fuselage former to ensure Adequate Clearance for Movement of Elevator Idler Pushrod 1-31-1980
135 920 Hardware Items Packaging 1-28-1980
134 Addition of a Second Angle Bracket with Attaching Hardware 1-29-1980
132 New Procedure for Checking contents of Kits 1-28-1980
131 Incorrect Parts in 920 Cowling Kit and Requirement for Replacement 1-25-1980
129 Inspection of Elevator Horn for Crack at Top Edge of Flange 1-29-1980
128 Inspect for Interference between Engine Oil Filler Tube and Engine Mount Member 12-27-1979
126 Inspect Elevator Control Linkage Idler Arm for Interference with Fuselage Cross Member 12-19-1979
116 50070-008 Flat Washer Replaces 50070-005 Flat Washer 12-12-1979
115 Part Number 31029-001 Engine Baffle Pilot Hole Location 12-12-1979
114 50195-003 Nutplate Replaced by 50195-009 Nutplate 12-12-1979
111 Procedure Error in 918 Manual Step F-13 11-29-1979
109 Inspection of Bolt Thread Engagement in Self-Locking Nut Described in Manual Step O-14 11-29-1979
108 Vender-Supplied Adapter Improperly Machined 11-26-1979
106 Paint Designs and Availablity of Masking and Painting Materials in 923 Kits 11-28-1979
102 Additional Hardware Required for 918 Kit in Accordance with Manual Revision 1 11-21-1979

You’ll need Adobe Acrobat Reader to view our service bulletins and letters.